You can share
Item-No. :
SG 729
Adaptor :
POM
Inner-connector :
Zinc-Alloy
Spring-steel :
Mn65
Rubber-refill :
teflon-coating-natural-rubber
Size :
12″--28″
Feature:
* Quiet & Smooth, minimal vibration, quick installation;
* Unique design for maximum windshield coverage;
* ISO 9001:2008 Quality management System for the manufacture and sale of heated wiper blades;
* Universal adapter to fit for different car models and makes in market;
* Easily to replace the rubber refill of heated wiper blades
* No water shadow stays in the heated wiper blades after being swept
* Never flying away at any speed
Specification (Size /Length: 12"--- 28")
Inch |
12” |
13” |
14” |
15” |
16” |
17” |
18” |
19” |
20” |
21” |
22” |
23” |
24” |
25” |
26” |
27” |
28” |
mm |
300 |
325 |
350 |
375 |
400 |
425 |
450 |
475 |
500 |
525 |
550 |
575 |
600 |
625 |
650 |
675 |
700 |
Suitable Vehicles
FAQ:
Q1. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment.
The specific delivery time depends on the wiper blade replacement and the
quantity of your order.
Q2. What is the most common cause of bent wiper blade replacement?
A: A driver that does not clear the windshield of built
up snow and just turns the wipers on.
Q3. How to quickly determine the problem and repair it?
A: Remove the arm assembly to see if the arm itself is
broken, Check the wiper blade replacement to see whether there is a problem with your
windshield wiper linkage. Check the linkage and make sure it has not become
disconnected, or replace the linkage if it is connected and continues to not
work. Is the Electrical Working? If the electrical system still isn’t working
(no noise, no movement) then perhaps you have a problem with a wire or a
circuit.
Q4. What is the importance of rubber?
A: Rubber infused with different materials or coated with different materials will offer more strength and resistance to harsh weather conditions, which can extend the life of your wiper blade replacement.
Packing and Delivery
1. Payment terms: T/T, Normally 30% down payment, 70% before shipment.
2. MOQ: 2000 pcs.
3. Sample lead time: 2-5 days.
4. Mass production time: 7-15 days depending on the order quantity.
5. Delivery method: By air, by sea or combined transportation,
Door to Door Service with Express: FedEX, DHL, UPS, EMS…
Contact Us
Tel:0086-13779936272
E-mail:[email protected]
Address: 410,No.1 Yulong International Building, Anling Road,Huli Area, Xiamen,China
Send the inquire, we will give you 2% off when star an order.